Access the Full Project by Clicking here!
Bidjugde
JOB
Dune Palms Road Bridge Improvements
BID DATE
10/5/22 - 10:00
AGENCY
La Quinta
ESTIMATE
n/a
SCOPE
The proposed work includes the roadway approach reconstruction to meet the proposed bridge structure elevation; street widening; construction of curb, curb/gutter, sidewalk, trail, retaining walls, median paving, driveway approaches, concrete slope protection and 6-foot tall garden wall; asphalt pavement with aggregate base; bridge construction; crack sealing and slurry sealing of roadway within construction limits; construction of a catch basins and drywells along with 18” and 24” HDPE N-12 pipe; signing and striping; landscaping and irrigation; and undergrounding of existing overhead utility poles. Project will also require the construction and removal of a bypass road, along with CVWD water main and sanitary sewer relocations. The sewer relocations will require the Contractor to prepare and implement a sewer bypass plan, which will need to be approved by CVWD. Contractor will also be required to demolish two mobile homes along with the single-family home as noted in the plans, includes the clearing of each housing pad and disconnecting all utilities connections to the structures. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. https://www.laquintaca.gov/business/design-and-development/bid-on-jobs
UPDATES