Farmington Bay Dyke Line Restoration
BID DATE
08/23/22 - 2:00
AGENCY
State Utah
ESTIMATE
n/a
SCOPE
The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide: approximately 17,000 cubic yards of cobble rock required to enhance 24,500 feet (4.6miles) of dike line at Farmington Bay WMA. 11,500 cubic yards of the cobble can be stockpiled in location #1, while 5500 yards could be side dumped directly at location #2. See attached map. In order to turn around for location #1, the driver will have to go the length of the dyke (5 miles) to turn around. The road is good and the turn around area is large. The agency would like the cobble by mid-September 2022. Ann Schliep aschliep@utah.gov