Access the Full Project by Clicking here!
Bidjugde
JOB
2023 Street Rehabilitation Task Order Contract Package 5 (Reconstruction)
BID DATE
08/16/22 - 2:00
AGENCY
San Antonio
ESTIMATE
$5,000,000
SCOPE
Project construction may include but is not limited to: street reconstruction to include subgrade proofrolling and treatment, installation of flexible and asphaltic base courses, installation of asphalt surface course, concrete pavement, concrete curbs, sidewalks, curb ramps, driveways, retaining walls, mailbox relocations, topsoil and sodding, pedestrian rail, signage and striping, tree removal and installation, speed humps, seal coat, and minor utility adjustments to include adjustment of existing manholes and valve boxes, relocating customer shutoff valves, backflow preventers and pressure reducing valves, existing meter and meter box relocation, short and long service relays, and adjusting existing sanitary sewer cleanouts. https://www.civcastusa.com/project/62cc50572b2f1c7ea4409891/summary hannah.haifa@sanantonio.gov
PREBID
7/26/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT