Access the Full Project by Clicking here!
Bidjugde
JOB
2019 2020 Sb 1 Maintenance Traffic Improvements Phase 2
BID DATE
09/8/22 - 3:00
AGENCY
Riverside
ESTIMATE
$3,914,600
SCOPE
The project entails street maintenance improvements on arterial street Martin Luther King Boulevard from Chicago Avenue to the I-215/SR-60 Freeway; and residential streets Hawarden Drive, Karendale Circle, De Grazia Road, Whistler Way, and Oleander Court. This project generally includes, but is not limited to, the resurfacing of deteriorated pavement with DGAC, FR-ARHM, FRAC and ARAM treatment; reconstructing damaged concrete sidewalks, driveways, pedestrian ramps, cross gutters, curbs, and gutters; adjustment of water meter boxes, gate valve covers, and sewer, storm drain, and electric manholes; and replacement of traffic signing/striping improvements. Citywide traffic improvements include but are not limited to installing new High-Intensity Activated Crosswalk (HAWK) traffic signals; new traffic signal installation, existing traffic signal modifications, poles, mast arms, road signs, luminaries, loop detectors, and underground conduit; removal and installation of pavement markings, traffic signs, posts, solar-powered speed feedback signs, LED stop signs and concrete bollards. Ben Hatheway,951-826-5561 https://pbsystem.planetbids.com/portal/39475/bo/bo-detail/97077#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT