Access the Full Project by Clicking here!
Bidjugde
JOB
Runway 6L 24R Exits Runway Rehabilitation
BID DATE
09/22/22 - 2:00
AGENCY
Los Angeles World Airports
ESTIMATE
n/a
SCOPE
demolition of existing pavement, subgrade preparation, mill and overlay, stabilized base, and PCC and AC pavement; construction of PCC and AC pavement; placement of barricades, installation and removal of temporary electrical, temporary markings, temporary blast fencing and traffic delineators during construction phasing to support this project; installation of various utility improvements, including drainage improvements, grading improvements, fueling modifications, airfield lighting, surface pavement markings, and signage improvements; modification of FAA facilities including installation of Runway Status Lights (RWSL); removal and relocation of Airport Surface Observation System (ASOS), windcones, Airport Surface Detection Equipment (ASDE) reflectors, Precision Approach Path Indicator (PAPI), Fiber Optic Transmission System (FOTS) and electrical power infrastructure; fuel hydrant and structure modifications; and other associated work. The successful Proposer shall be working adjacent to active runways and taxiways, and will need to coordinate construction and phasing coordination with other adjacent ongoing stakeholder projects. For full details of the required scope, please see the Contract Documents. pdgprocurement@lawa.org https://www.rampla.org/s/opportunity-details?id=0066g00003YrFET
PREBID
8/25/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT