Access the Full Project by Clicking here!
Bidjugde
JOB
Main Street Green St Gateway Improvements
BID DATE
09/13/22 - 2:00
AGENCY
El Cajon
ESTIMATE
$2,800,000
SCOPE
Mobilization, traffic control, NPDES Permit, improvements within MTS Right-of-Way, concrete and asphalt saw cutting, clearing and grubbing, demolition, removal and disposal of existing improvements including sidewalks, driveways, curbs, gutters, asphalt pavement, pavement interlayer fabric, excavated materials, trees and tree roots, earthwork, erosion control, preparation of subgrade, grading to include excavation and fill, construction of PCC sidewalks, driveways, curbs and gutters, placing of asphalt concrete on imported base material, sidewalk underdrains, curb ramps, landscaping and irrigation, storm drain facilities, street lighting system and fiber optic system, traffic signal modification, utility adjustments, relocation and replacement of all facilities in conflict with the proposed improvements, cleanup, and other work as may be necessary to render the above improvements complete and workable in accordance with the terms, conditions, and specifications of Bid No. 006-23. Mara Romano 619-441-1787 mromano@elcajon.gov
PREBID
8/25/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT