Access the Full Project by Clicking here!
Bidjugde
JOB
Prescott East Highway Reconstruction
BID DATE
09/8/22 - 2:00
AGENCY
Yavapai County
ESTIMATE
$4,482,610
SCOPE
State Route 69 to Copper Hill Drive Remove existing asphaltic concrete by mill up to a depth of 4” and pave the roadway with 4” new asphaltic concrete (AC). Widen PEH from Frontage Road to Copper Hill Drive for the addition of northbound right-turn lane at Copper Hill Drive intersection. The added pavement shall have a structural section of 6” new AC and 8” new aggregate base (AB) with a single layer of geogrid. Construct new concrete sidewalk with new curb and gutter. Copper Hill Drive to Sunset Lane Pulverize existing pavement up to a depth of 9”. Grade FDR base in-place per design plan prior to cement treatment. Construct new 6 feet wide concrete median and install concrete roundabouts at 3 locations. Install 2” new AB and 5” new AC over cement treated FDR base. Widening northbound approach of PEH at Sunset Lane intersection to add dedicated left and right turn lanes. Sunset Lane to Antelope Lane Pulverize existing pavement up to a depth of 9”. Grade FDR base in-place per design plan prior to cement treatment. Reconfigure PEH median near Sunset Lane intersection to add a southbound left-turn lane. Reconfigure PEH median at 2 locations to accommodate the installation of 2 roundabouts. Remove and reinstall single curb along remaining median. Install 2” new aggregate base over cement treated FDR base, and finish paving with 5” of new asphaltic concrete.
PREBID
8/30/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT