Access the Full Project by Clicking here!
Bidjugde
JOB
Riverside Avenue Central Reconstruction
BID DATE
09/13/22 - 3:00
AGENCY
Rialto
ESTIMATE
$4,500,000
SCOPE
The Work comprises the furnishing all materials, equipment, tools, labor, incidentals, all implied requirements, and all appurtenant work as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; construction staking and monument perpetuation; removal and replacement of PCC curbs, gutters, cross-gutters, curb ramps, driveways, and sidewalk; cold milling; crack sealing; cement stabilized pulverized base (CSPB); full depth reclamation-cement; hot mix asphalt (HMA); rubberized hot mix asphalt (RHMA) surface course; and adjustment of surface utilities to grade. The work also includes traffic striping and pavement markings, installation of detectable warning surfaces, traffic signal loop replacement, and all associated work as identified on the construction drawings. Art Cervantes,acervantes@rialtoca.gov https://pbsystem.planetbids.com/portal/28159/bo/bo-detail/96915#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT