Access the Full Project by Clicking here!
Bidjugde
JOB
South Virginia Park
BID DATE
09/13/22 - 2:00
AGENCY
Roswell
ESTIMATE
n/a
SCOPE
This project is to construct a new park in an existing vacant lot. It consists of some removals of existing trees and chain link fence, grading existing natural ground down to finished grade, unclassified excavation of existing 6" soil and replace with 6" of borrow material. New concrete fillets and new wheel chair ramps, new concrete sidewalk, new curb & gutter, new electric power pole with new meter, electrical conduit and wiring, electric service panel, new irrigation system with irrigation control cabinet and controller, 4" backflow preventer and hot box, a SWPPP plan and maintenance, grass seeding, and construction staking by the Contractor. a.alarcon@roswell-nm.gov https://www.roswell-nm.gov/bids.aspx?bidID=144

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT