Access the Full Project by Clicking here!
Bidjugde
JOB
18th Street Utility Improvements
BID DATE
11/10/22 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The project generally consist of the furnishings of all labor, materials, equipment, appurtenances, and incidentals as required to properly fabricate, construct, inspect, and test the construction items required for the replacement of water and wastewater utilities as well as sidewalk, pedestrian ramp and pavement repair along 18th Street from Waco Drive to Bosque Drive and along the block containing Fort Avenue, Sanger Avenue and 17th Street. daryleb@wacotx.gov https://www.civcastusa.com/project/63404bfe45071b38a3c565d9/summary
UPDATES