Access the Full Project by Clicking here!
Bidjugde
JOB
West McNeil Roadway Improvements
BID DATE
08/25/22 - 2:00
AGENCY
Show Low
ESTIMATE
$605,000
SCOPE
Work includes, but is not necessarily limited to removing the deteriorating sidewalk curb and drainage facilities and installing approximately 3,100 linear feet of new curb, 2,200 square feet of new sidewalk, ADA ramps, driveways, and new drainage infrastructure to facilitate the new sidewalk and curb improvements. The work also includes pulverizing the existing asphalt, removing excess material and installing a new 4” asphalt overlay. The work includes all required labor, material, incidentals, transportation, traffic control, and services required for the project to complete a usable and operable facility in accordance with all pertinent codes and regulations as necessary to complete the job in a workmanlike manner as shown on the Construction and Bid Documents. The work shall take place along West McNeil from Fox Canyon to the Deuce of Clubs in Show Low Arizona.
UPDATES