JOB
Bluebird Storm Drain Outfall Diversion Structure Rehabilitation
BID DATE
08/10/22 - 2:00
AGENCY
Laguna Beach
ESTIMATE
n/a
SCOPE
In general, the work includes providing all materials, equipment, labor, tools, and incidentals as required by the contract documents to remove and rehabilitate the Bluebird Storm Drain Outfall and Diversion Structure in the City of Laguna Beach, where the existing Bluebird Canyon outfall (84-inch reinforced concrete pipe) discharges to the Pacific Ocean off the Bluebird Canyon Drive beach access area. https://pbsystem.planetbids.com/portal/43728/bo/bo-detail/96100 hbroida@lagunabeachcity.net
PREBID
7/27/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT