Access the Full Project by Clicking here!
Bidjugde
JOB
Sanitary Sewer Rehabilitation Contract 113 Part 4
BID DATE
08/18/22 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
Construction project consists of the replacement of 1,290 linear feet of 8-inch water pipe, 1,223 linear feet of 8-inch sanitary sewer pipe by open cut, and 1,336 linear feet of 8-inch sanitary sewer pipe by other than open cut. The areas are: along Hulen Sreet. from Wilton Drive to Wheelock Drive along Altamesa Boulevard near Vega Drive, the intersection of North Wedgemont Circle and Winifred Drive at Misty Meadows Drive South between Santa Rita Drive and Holly Springs Drive. Proposed water improvements include the removal and replacement of one fire hydrant and 14 1-inch water services including permanent asphalt pavement repair. Proposed sanitary sewer improvements include the replacement of 11 4-inch sewer services, ten 4-inch sewer service reinstatements and 15 4-foot diameter sanitary sewer manholes including permanent asphalt and concrete pavement repairs. Proposed pavement improvements include a 2-inch minimum mill and overlay (MOL) of approximately 3,333square yards of asphalt pavement along with the removal and replacement of 1,060 linear feet of 6-inch concrete curb and gutter, 5,000 square feet of 4-inch sidewalk and 2,000 square feet of 6-inch concrete driveway. https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/water/2022/102785 dena.johnson@fortworthtexas.gov
PREBID
8/8/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT