City Holladay Meadowmoor Area Storm Drain Improvements
BID DATE
10/10/22 - 5:00
AGENCY
Holladay
ESTIMATE
n/a
SCOPE
An existing storm drain runs through backyards and side yards and cannot be properly maintained due to access constraints. The storm drain is compromised by root intrusion and sediment deposits. Surcharging of the existing storm drain has resulted in the flooding of several basements adjacent to the storm drain alignment. The purpose of the project is to construct a new storm drain within the paved roadway. The total length of the proposed alignment is approx. 3,250 ft. The existing storm drain pipe is 36” dia. concrete. It is anticipated the proposed pipe will be 36” or 48” dia. jbunch@cityofholladay.com