Street Reconstruction Group 1801
BID DATE
08/30/22 - 2:00
AGENCY
San Diego
ESTIMATE
$10,200,000
SCOPE
The scope of work for this project involves furnishing all labor, materials, equipment, services and construction which include pavement reconstruction utilizing the full depth reclamation method and slurry seal, replacing traffic signal detection loops and stub outs, adjustment of city manholes and gate valve covers, installation of curb ramps to meet ADA requirements, installation of pedestrian barricades at prohibited crossing movements, installation of bus pads, replacing damaged sidewalks, tree removal, root pruning and barrier, curb & gutter and cross gutters, replacing traffic striping/markings, signs and legends, installation of storm drain pipes, cleanouts and inlets, and installation of modular wetland systems within project drainage management area along Gold Coast Drive between Thanksgiving Lane to Camino Ruiz and Park Dale Avenue between Northrup Drive and Mira Mesa Boulevard. This project will also include segments of water main replacement. In addition, the "FDR" work consists of remedial grading, pulverizing and blending of the existing base, and subgrade soil as described in the special provisions Appendix H, FDR Construction Specifications and Appendix I, Pavement Investigation Report. Juan E. Espindola,619-533-4491,jeespindola@sandiego.gov https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/96512#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT