JOB
Montclaire Way Storm Drain Outfall Repair
BID DATE
08/30/22 - 2:00
AGENCY
Los Altos
ESTIMATE
$55,000
SCOPE
The project includes the repair of a culvert and bank erosion on the eastern creek bank and channel. The existing exposed 12-inch culvert pipe will be cut, removed and replaced back to a 45-degree angle in the existing storm drain line. The replacement pipe will be a 12” HDPE pipe that will be installed to align flush with the creek bank. Around the culvert outfall, approximately 110 square feet of bank will be disturbed and approximately 13 cubic yards of rip rap will be placed. Soil will be placed to fill the rip rap voids and the voids will be planted with native plants. https://bids.losaltosca.gov/rfp/bid-1266-montclaire-way-storm-drain-outfall-repair-project