Bidjugde
JOB
Mountain Green Sewer Improvement District
BID DATE
09/10/22 - 6:30
AGENCY
Mountain Green Sewer ID
ESTIMATE
$15,000,000
SCOPE
The Project consists of but not limited to the following: • Draining of existing cell #2. • Construction of 6,500 SF Operations Building (Split Face CMU). • Construction of 5,000 SF Headworks Building (Split Face CMU). • Installation of Biological Nutrient Removal Basin Equipment. • Construction of (2) Clarifiers. • Construction of a Large Digester Split Into (2) Sides. • Electrical, Mechanical HVAC, and Plumbing. • Chemical feed system: Two dual pump skid (4 pumps total), 1/2" tubing, 1/2" sch 80 PVC, 3" conduit, Pressure Gauges, • Construction of Yard Piping including 6”-24” HDPE and Ductile Iron Lines, Sewer, Chemical Lines, Backwash Piping, Sludge Piping, Return Waste Water Lines, and Electrical System Upgrades including on-site back-up generator. • Site Construction including import structural fill, asphalt paving, landscaping, and curb and gutter. • Installation of Mechanical Dewatering System (Screw Press). Grant Herdrich +1 801-957-7125 gherdrich@utah.gov
UPDATES