2022 Asphalt Work Rear Phase 1
BID DATE
08/4/22 - 1:00
AGENCY
Yavapai Prescott Indian Tribe
ESTIMATE
n/a
SCOPE
Areas with bad substrate, remove bad soils, install and compact 6" ABC. Repave with 4" MAG C 3/4 asphalt over aggregate base, while maintaining existing drainage. All new edges to match existing pavement and at the west drive entrance, asphalt curb used as water diverter to be reinstalled. All existing utility structures within the area of work shall be raised to match finish grade. Stripping - Provide parking lot stripping over new asphalt areas, stripping plan to be provided at pre-bid meeting. Drainage at trash enclosure identified on map adjusted to allow for positive flow to existing valley gutter. Include price to install delivery ramps at the rear of the current restaurants, provided at pre-bid meeting. asmyly@ypit.com htippit@ypit.com