Access the Full Project by Clicking here!
Bidjugde
JOB
Traverse Ridge Pedestrian Refuge Island
BID DATE
07/27/22 - 2:00
AGENCY
Draper
ESTIMATE
n/a
SCOPE
QC program; mobilization; temporary facilities; erosion control measure during construction; construction surveying; materials testing; saw cutting, removal and disposal of existing trench pavement; unclassified excavation; pot hole excavations; trench excavations; trench shoring or trench boxes as applicable; removal and disposal of waste materials; trench dewatering; miscellaneous dewatering; pipe zone material; select import fill material (where needed); compaction of trench backfill materials; compaction density testing; construction water; dust control; traffic control; managing storm water runoff during construction; removing and replacing fencing impacted by construction Eric Lundell +1 801-576-6365 eric.lundell@draper.ut.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT