Access the Full Project by Clicking here!
Bidjugde
JOB
Overlay Fall FY 22 23
BID DATE
07/14/22 - 11:00
AGENCY
Yavapai County
ESTIMATE
$1,369,138
SCOPE
The scope of work includes furnishing of all labor, materials, equipment, fixtures, and services required for a 2” asphaltic concrete overlay on 9,680 Linear Feet (LF) of Red Rock Loop Road in Sedona, 847 LF of East Kings Way and 1,912 LF of Mesquite Drive in Black Canyon City, and 2,571 LF of Thousand Trails Road and 2,477 LF of Warriors Run in Cottonwood. The project has approximately 5,863 tons of fiber-reinforced asphaltic concrete with PG 70-10 binder. Other associated work includes an approximately 150 square yards of pavement removal and replacement section with geogrid, grouted riprap installation at 6 low water crossings and re-establishing existing pavement markings throughout the project. All work is to be done in accordance with the plans, specifications, and contract documents. PublicWorksBids@yavapaiaz.gov
PREBID
7/5/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT