JOB
Recycled Water Transfer Improvements
BID DATE
07/21/22 - 2:00
AGENCY
Windsor
ESTIMATE
$944,000
SCOPE
The work consists of improvements at three separate locations. At the CSA Pump Station, the work consists of: demolition and replacement of concrete, replacement of two below grade valves and two vertical turbine pumps, replacement of aboveground piping, valves and appurtenances, installation of two magnetic flow meters, control shelter improvements, and installation of electrical controls and telemetry equipment. At the Pond 8 Site, the work consists of: undergrounding an above ground recycled water line, installation of a pressure sustaining valve, and completion of associated aboveground piping, valves, and appurtenances. At the Conde Lane site, the work consists of: traffic control, completing a recycled water main tie-in with an associated lateral, installation of a manhole outside of the traffic right of way with an aboveground enclosure/structure, and tie into an existing sewer manhole. gbroughton@townofwindsor.com https://www.townofwindsor.com/bids.aspx?bidId=71
PREBID
7/14/2022 9:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT