Clear Creek Wastewater Treatment Plant Pyrolysis Phase 1
BID DATE
07/19/22 - 3:00
AGENCY
Redding
ESTIMATE
$3,900,000
SCOPE
The following items are included in the scope of this project: • Installation of biodryers and pyrolysis units for biosolids treatment for solids reduction; • Installation of conveyors and elevated support structure with walkway for access and utility routing; • Installation of a transformer; • Installation of an electrical building; • Construction of concrete slabs • Installation of a pre-engineered metal canopy • Site work including yard piping, grading, paving, fencing, and electrical; • and all other items of work as detailed on the plans and in the specifications. Project Engineer: Corri Vandiver @ 530-245-7120