Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2022 23 Annual Major Streets Rehab Program
BID DATE
07/18/22 - 4:30
AGENCY
Simi Valley
ESTIMATE
n/a
SCOPE
The Major Street Rehabilitation Program (Program) will consist of: 1) construction surveying, and all appurtenant work; 2) 401,000 S.F. of asphalt pavement cold milling; 3) sawcut, removal, and reconstruction of 2,233 S.F. of sidewalk; 4) sawcut, removal, and reconstruction of 164 L.F. of concrete curb and gutter; 5) 1,455 S.F. of sawcut, removal, and reconstruction of concrete cross and/or longitudinal gutter; 6) sawcut, removal, and reconstruction of 17 curb ramps; 7) 205 L.F. of concrete sidewalk grinding; 8) placement of 6,266 tons of asphalt; 9) traffic signing and pavement delineation; 10) traffic signal video detection system; 11) 17 adjustment and replacement of manhole frame and cover; 12) 5 water valve assembly replacements; 13) 5 adjustment of storm drain manhole to grade. The expected completion time of the Program is 50 consecutive working days after receipt of the Notice to Proceed. https://www.simivalley.org/Home/Components/RFP/RFP/47/169 bzastrow@simivalley.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT