Access the Full Project by Clicking here!
Bidjugde
JOB
West El Camino Rehabilitation
BID DATE
07/6/22 - 2:00
AGENCY
Sacramento
ESTIMATE
$1,793,000
SCOPE
The work to be performed under these Special Provisions consists of resurfacing (asphalt rubber cape seal and slurry seal), striping/signage, base repair, and part reconstruction of West El Camino Avenue from Truxel Road to the Northgate Boulevard. The work includes base repair of the pavement, resurfacing, removal and placing new striping and signage, placing limited new curbs, gutters, sidewalks and median islands. This work shall consist of mixing asphaltic emulsion, aggregate, set-control additives, water, and spreading the mixture on properly prepared surfacing and any other work involved in constructing or placing material.The underground work includes adjusting utility frames, boxes to match new grades. Jose Ledesma,JLedesma@cityofsacramento.org https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/95493#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT