Access the Full Project by Clicking here!
Bidjugde
JOB
City of Corrigan US 59 Bypass & US 287 Water/Sewer Relocation Services
BID DATE
07/6/22 - 11:00
AGENCY
Corrigan
ESTIMATE
$310,000
SCOPE
Base Bid A: Approximately 720 LF 2” waterline & associated work on Poncho Road. As shown on Plans. Base Bid B: Approximately 2,844 LF of 8” waterline & associated work, approximately 3,286 LF of 2” sewer force main & associated work, and installation of 2 manholes on an existing 8” sewer line. This portion of the Project is associated with relocation work alongside and crossing US 287 and the proposed route of the US 59 Bypass corridor. As shown on Plans. 60 days construction time for both Base Bid Packages (A & B). Base Bid A: Approximately 720 LF 2” waterline & associated work on Poncho Road. As shown on Plans. Base Bid B: Approximately 2,844 LF of 8” waterline & associated work, approximately 3,286 LF of 2” sewer force main & associated work, and installation of 2 manholes on an existing 8” sewer line. This portion of the Project is associated with relocation work alongside and crossing US 287 and the proposed route of the US 59 Bypass corridor. As shown on Plans. 60 days construction time for both Base Bid Packages (A & B). https://www.civcastusa.com/project/62a76272ab02ab9e4b7e0dc2/summary joverby@glstexas.com ;

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT