Access the Full Project by Clicking here!
Bidjugde
JOB
Sabine Cr WWTP Expansion to 7 MGD
BID DATE
07/19/22 - 2:00
AGENCY
North Texas Municipal Water District
ESTIMATE
n/a
SCOPE
Scope generally includes: New junction structure adjacent to and interconnected to existing, complete wiht interceptor connections, motorized gate and outlet piping with manholes to new influent lift station. New dry pit influent lift station with new adjacent electrical building and new biotrickling filter odor control system to serve both the new and existing influent lift stations. New elevated headworks facility with screening and grit removal equipment and new dedicated biotrickling filter odor control system. New secondary treatment facilities including aeration basins, blower building, secondary clarifiers and secondary sludge pump station. Installation and startup of new screw press in dewatering canopy building, while maintaining the existing belt filter press in service, followed by replacement of belt filter press with second screw press. New biotrickling filter odorcontrol system to serve both the new equipment in the dewatering canopy building and the existing headworks. New tertiary treatment facilities including disc filter structures and addition of UV modules in existing modified channels and new UV outlet box. Yard piping including influent to lift station, force main to headworks, interconnections with existing force main, interconnecting piping between headworks, piping from headworks to secondary treatment, gravity and pumped piping between secondary treatment tanks, dewatering and interconnection with existing secondary treatment system, piping to and between tertiary treatment tanks and channels, new outfall pipe and structure, process drainage, non-potable water and miscellaneous piping. Site civil including grading, drainage, and a combination of reinforced concrete and asphalt paved roads, sidewalks, perimeter fencing and relocation of entrance gate. New electrical building, engine generator with load bank, transformers, and site electrical conduit, manholes, site lighting and electrical associated with process facilities. New SCADA equipment, site I&C conduit, instrumentation and control equipment throughout site to serve process facilities. https://www.civcastusa.com/project/629e2724ed93d3adc5d23533/summary bruce.cole@aecom.com
UPDATES