Access the Full Project by Clicking here!
Bidjugde
JOB
Maxwell Water Cross Replacement Repair Phase 2
BID DATE
07/7/22 - 2:00
AGENCY
Abilene
ESTIMATE
n/a
SCOPE
This project is the replacement of two water crossings at Maxwell Municipal Golf Course in Abilene, Texas and the repair of guard rails on three other crossings. Bid Option #1 - The creek crossings at #8 and #9 green shall be replaced with concrete low water crossings and the existing crossings removed. Guard rails at #10 tee, #10 green and #13 green shall be replaced with new channel type guard rails. Bid Option #2 – The creek crossing at #8 and #9 green shall be replaced with bridge structures and the existing crossings removed. Guard rails at #10 tee, #10 green and #13 green shall be replaced with new channel type guard rails. lesli.andrews@abilenetx.gov purchasing@abilenetx.gov https://www.abilenetx.gov/Bids.aspx?BidID=192

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT