Access the Full Project by Clicking here!
Bidjugde
JOB
2022 Citywide Roadway Improvement Sidewalk Connectivity
BID DATE
07/7/22 - 2:00
AGENCY
Show Low
ESTIMATE
$1,060,000
SCOPE
The work includes the reconstruction of 10,000 LF of roadway including portions of S. 28th Street, N. 4th Ave, N 4th Dr, N. 5th Dr., N. 6th Dr., N. 8th Ave., West Cooley, N. 24th Dr., and N. 25th Dr as well as concrete curb/sidewalk installation along West Cooley and West Owens. The work includes, but is not necessarily limited to, the pulverization of approximately 24,200 SY of existing asphalt roadway, recycle and mixing existing asphalt millings into existing base, subgrade preparation and compaction, reshaping the roadway grade, installing new asphalt pavement overlay, re-establish roadway shoulder, adjusting water valves and manholes, Installing concrete curb and gutter with 5’ sidewalk, drainage improvements required for the work, and other items necessary for the accomplishment of the improvements. The work includes all required labor, material, incidentals, transportation, traffic control, and services required for the project to complete a usable and operable facility in accordance with all pertinent codes and regulations as necessary to complete the job in a workmanlike manner as shown on the Construction and Bid Documents. This work shall take place within the right-of-way along portions of S. 28th Street, N. 4th Ave, N 4th Dr, N. 5th Dr., N. 6th Dr., N. 8th Ave., West Cooley, N. 24th Dr., and N. 25th Dr as well as concrete curb/sidewalk installation along West Cooley and West Owens in Show Low. http://showlowaz.gov/Bids.aspx?BidID=162
UPDATES