Wastewater Manhole Rehabilitation Phase 13
BID DATE
07/14/22 - 1:00 LIVE!
AGENCY
Mesa
ESTIMATE
$1,850,000
SCOPE
The Contractor shall be responsible for rehabilitation of 125 wastewater manholes. The scope of work includes surface preparation, installation of corrosion resistant coating on 108 manholes, structural inserts at 9 manholes, spot repairs of corrosion resistant coating on 7 manholes, Predl thermoplastic line system on 1 manhole and other work as necessary for completion of the project. All work shall be installed in accordance with the project Contract Documents including Table 1, Project Specific Provisions and Technical Specifications. The use of flow through tubes (or bypass pumping) will be required at all manholes for completion of the work within this project. EngineeringBids@mesaaz.gov stephanie.gishey@mesaaz.gov