Access the Full Project by Clicking here!
Bidjugde
JOB
(DB) CAP LPP Intersection Wellfield Pipeline
BID DATE
08/30/22 - 10:00
AGENCY
Peoria
ESTIMATE
$40,161,250
SCOPE
SELECTION 9/1/22: ? Seven (7) groundwater exploratory borings (Well Drilling) ? Permitting will be conducted by others ? Five (5) groundwater well installations (Well Drilling, Development and Testing) ? Permitting will be conducted by others ? Five (5) equipped recovery well sites (Well Equipping), including: ? All associated sitework per current City facility standards ? All associated electrical, instrumentation and control equipment ? Coordinating with APS to bring power to the site ? Design and construction permitting, inspection, testing, commissioning, and start up ? Approximately 9,200 LF of raw water pipelines (8” to 16”) to convey water to a new reservoir facility (Pipeline), including: ? Design and construction permitting, testing, and inspection ? This project will not include the 24” water and reclaimed water transmission mains identified in the above exhibit drew.ashmun@peoriaaz.gov https://peoriaaz.bonfirehub.com/opportunities/69698
UPDATES