Access the Full Project by Clicking here!
Bidjugde
JOB
Pressure Reducing Valve Improvements
BID DATE
06/29/22 - 2:00
AGENCY
Las Vegas - NM
ESTIMATE
n/a
SCOPE
The Project includes the following Work: 1.New Pressure Reducing Valve (PRV) Station No. 8 with 6" PRV and new 2" PRV. 2.New PRV Station No. 9 with 8" PRV and 4" PRV. 3.Remove and dispose of existing PRV Station No. 8. 4.Remove and dispose of existing PRV Station No. 9. 5.Improvements to PRV Station No. 1 with rehabilitation of existing 12" PRV and 4" PRV. 6.Improvements to PRV Station No. 3 with rehabilitation of existing 6" PRV and with new 2" PRV. 7.Improvements to PRV Station No. 4 with rehabilitation of existing 6" PRV and with new 2" PRV. 8.Improvements to PRV Station No. 5 with rehabilitation of existing 6" PRV and with new 2" PRV. 9.Improvements to PRV Station No. 6 with rehabilitation of existing 8" PRV and existing 4" PRV. 10.Improvements to PRV Station No. 7 with rehabilitation of existing 10" PRV, removal of existing 4" flow meter, and installing a new 4" low-flow PRV. 11. Improvements to PRV Station No. 11 with rehabilitation of existing 6" PRV and installing a new 2" PRV. 12. Improvements to PRV Station No. 13 with a new 2" PRV. 13. Demolition of Alamo Street Pump / PRV Building. Removal and disposal of the existing metal building and concrete foundation, all electrical components, exposed piping system, and buried piping system. Restore ground surface to match surrounding surfaces.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT