Access the Full Project by Clicking here!
Bidjugde
JOB
Blanco Riverine Flood Mitigation
BID DATE
07/14/22 - 2:00
AGENCY
San Marcos - TX
ESTIMATE
$14,800,000
SCOPE
Includes berm/floodwall structure located between River Road and the Blanco River to contain flood waters during the 50-year and more frequent flood events. The concrete flood wall is recommended to minimize right of way and structure acquisition. In addition to the berm and floodwall, a relief channel is proposed to efficiently transfer Blanco River flows to the San Marcos River. http://sanmarcostx.gov/Bids.aspx?BidID=536 RShelton@sanmarcostx.gov cosmpurchasing@sanmarcostx.gov
PREBID
6/21/2022 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT