Access the Full Project by Clicking here!
Bidjugde
JOB
Chloramine Booster Kirker Pass Pump Station Rehabilitation
BID DATE
07/19/22 - 1:30
AGENCY
Contra Costa WD
ESTIMATE
n/a
SCOPE
The Work includes, but is not limited to, the following: 1. Kirker Pass Pump Station: Replacement of existing electrical meter/main and motor control center (MCC) at a new location on the site, installation of new automatic transfer switch (ATS), installation of masonry shade structure, installation of light pole, replacement of existing pump station concrete pad, removal and reinstallation of pump station mechanical equipment related to concrete pad replacement, installation of additional asphalt paving, replace 4” surge tank isolation valve, removal of surge tank bladder and installation of air compressor, replacement of existing flow meter, replacement of various pump instrumentation, and installation and configuration of Schneider Electric Asset Advisor and one year subscription for service. 2. Kirker Pass Reservoir: Replacement of existing utility meter and panelboard with new panelboard. 3. East Reservoir: Installation of SCADA antenna, installation of electrical conduit and associated wires within the access road between the Kirker Pass pump station and East Reservoir, installation of water supply pump within reservoir including coring reservoir wall and installation of the tubing, installation of chemical feed enclosure including associated sodium hypochlorite and LSA storage tanks, pumps, analyzers, control panel, HVAC, sample sink, and sodium hypochlorite generator (system supplied by PSI Water Technologies, Inc.), installation of chemical feed and sample tubing within containment pipe, installation of electrical control panel, panelboard, and transformer, installation of concrete pad for chemical feed system enclosure including minor grading, installation of asphalt paving and installation of storm drain pipe. bidcoordinator@ccwater.com
UPDATES