Littlerock Sediment Removal Phase 2 FY 2022 2026
BID DATE
07/22/22 - 1:00
AGENCY
Palmdale WD
ESTIMATE
n/a
SCOPE
The excavation area starts just upstream of the Dam and extends approximately 4,500 feet upstream of the Dam. The maximum excavation depth would be approximately 14 feet approximately 800 feet upstream of the Dam. The new channel bottom would taper upstream to the existing grade at the upstream limits of excavation. The second phase is the removal of 1,165,000 cubic yards of accumulated sediment from within the Reservoir over a 7 to 12-year timeframe srogers@palmdalewater.org https://secure.procurenow.com/portal/palmdalewater/projects/21256?section=163902