Airport Taxiway Southern Apron Phase 2
BID DATE
06/30/22 - 7:00
AGENCY
Buckeye
ESTIMATE
$1,066,358
SCOPE
This project will reconstruct and realign the southern taxiways consisting of approximately 12,000 square yards (SY) of asphalt concrete (AC) pavement. New LED taxiway edge lighting and airfield guidance signage will be installed, along with new underground conduit infrastructure and upgrades in the Electrical Vault including providing a new Constant Current Regulator (CCR). A new storm drain will serve the infield areas between Taxiway ‘J’ and the airport hangars and will outlet into a channel running parallel to Taxiway ‘J’. A new culvert will convey flows underneath Taxiway ‘D3’ from the infield area to the south. These items are more particularly defined in Sections 500 and 600, General Contract Provisions and Construction Project Drawings attached hereto. pglasmann@buckeyeaz.gov https://www.buckeyeaz.gov/Home/Components/RFP/RFP/158/409