(CMAR) Mesa Drive Improvements 8th Ave Main St Phase II
BID DATE
01/20/15 - 3:00
AGENCY
Mesa
ESTIMATE
$14,000,000
SCOPE
PER MESA REP 1/7/15, NO INFO UNTIL END OF FEB: SHORTLIST 11/13/14: Reconstruct existing traffic through lanes, install raised landscaped medians, connecting to the recently completed portion of Mesa Drive south of 8th Ave. and the proposed Light Rail improvements, approximately 100’ south of Main Street.  Reconstruct the Broadway Road intersection with Mesa Drive to install raised medians and dual left turn lanes for north, east, south and west bound traffic.  Install new underground utilities (water, wastewater, storm drain, gas and electrical power) as needed to complete previous improvements and accommodate new roadway construction.  Underground City of Mesa 12Kv overhead electrical lines from 8th Ave to Main Street.  Continue the general character of hardscape and landscaping from Mesa Drive Phase I through to Main Street.  Coordinate with the proposed street and median improvements proposed with the 1 st Avenue Project. Heather Sneddon of the Engineering Department at 480-644-3269, Fax 480- 644-3392, E-Mail: heather.sneddon@mesaaz.gov.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT