3rd East Phase II Marcus Artesian Basin
BID DATE
06/17/22 - 2:00
AGENCY
Salt Lake
ESTIMATE
$14,171,414
SCOPE
Installation of approximately 8,100 linear feet of 24, 30 and 36-inch welded steel water transmission pipeline; approximately 2,300 linear feet existing water transmission pipeline rehabilitation with loose fit 30-inch HDPE slip lining; 36, 42, and 48-inch steel casing jack and bore roadway and utility crossings; associated valve and meter vaults; associated fittings and appurtenances; associated electrical and controls; approximately 560 linear feet of 18-inch RCP reservoir drain overflow piping and appurtenances; associated pavement and site restorations. Kevin Kranendonk +801 (483) 6841 kevin.kranendonk@slcgov.com