Princeton Water Main CIP 6 8 17
BID DATE
06/30/22 - 10:00
AGENCY
Princeton
ESTIMATE
n/a
SCOPE
The Work is to include furnishing all labor, materials, and equipment, and performing all work necessary for the construction of approximately two thousand, eight hundred thirty-four (2,734) linear feet of 24-inch water line, four thousand, four hundred and nine (4,409) linear feet of 20-inch water line, two thousand, one hundred sixty-six (2,166) linear feet of 16-inch water line, and one hundred six (106) linear feet of 12-inch water line as detailed in the Construction Plans and Specifications. The 24-inch water line A connects to the existing 24-inch butterfly valve located south of the Forest Grove Pump Station and runs east towards Princeton Meadows Boulevard. The 24-inch water line then transitions to a 20-inch water line as it crosses Princeton Meadows Boulevard and terminates on the west side of Princeton Meadows Boulevard north of HWY 380. The 16-inch water line B connects to the existing 20-inch Arcadia Farms water line and continues north along the west side of Cypress Bend Parkway and connects to the existing 24-inch water line on the south side of HWY 380. The 20-inch water line C connects to the existing 20-inch Arcadia Farms water line and continues south toward Fire Station No. 3 where it crosses County Road 400 and continues along Myrick Lane. https://www.civcastusa.com/project/628c017f3eabc09b45d2ce70/summary sfort@princetontx.us
PREBID
6/16/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT