Access the Full Project by Clicking here!
Bidjugde
JOB
Murphy Reservoir Replacement
BID DATE
06/23/22 - 10:00
AGENCY
Whittier
ESTIMATE
n/a
SCOPE
The Murphy Reservoir Replacement project consist of construction of a 2.31 Million Gallon (MG) prestressed concrete reservoir including exterior stairway, interior ladder, access hatches, vent, overflow pipe, drain line inlet, outlet line, sample taps, and miscellaneous appurtenances; demolition and removal of the existing two 0.5 MG concrete reservoirs; grading of the site; shotcrete wall; concrete masonry block retaining wall; installation and removal of two HDPE 10,000 gallon temporary water storage tanks (City Purchased); temporary 12” HDPE piping and fittings; approximately 750’ of 16” DIP inlet/outlet line; approximately 126’ of 12” inlet line; approximately 75’ of 12” drain/overflow line; approximately 165’ of 8” drain/overflow line approximately 1,175’ of concrete curb and gutter and concrete swale; approximately 20,750 SF of AC Pavement, approximately 23,100 SF of aggregate base; connections to existing line, miscellaneous appurtenances including valve vault, check valves, flex tend flexible joint; underground conduits for power and SCADA; connection of the new electrical and SCADA to the Murphy Pump Station; level controls for the reservoir; miscellaneous lights and controls; and miscellaneous site work pubwks@cityofwhittier.org
PREBID
6/8/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT