Access the Full Project by Clicking here!
Bidjugde
JOB
2022 City Overlay Projects SOJO
BID DATE
06/8/22 - 3:00
AGENCY
South Jordan
ESTIMATE
n/a
SCOPE
This is the regular maintenance of city roadways which includes mill and overlay of asphalt street sections, trails, and parking lots. The city uses a 1.5” edge mill and 2” overlay of PG58-28 asphalt mix for its residential streets, trails, and most parking lot applications. The collector streets and arterials receive a 2” mill and 3” overlay of PG64-34 Super Pave mix (the UDOT super pave mix). The Work on South Jordan Parkway/Harvest Pointe Dr includes a 2” Mill and 2” Overlay PG 64-34 UDOT Spec Superpave Mix encompassing 9,050 Square feet. Overlay areas as outlined on references plan maps will follow specified standards and generally includes but are not limited to 2” Full Width Milling, Delivery, Placement, and Compaction of 3” Superpave Asphalt Overlay; Raise Monuments, Valves, and Sewer and Manhole Lids to Grade; Replace Existing Striping; and any other Materials and Labor necessary to complete the job based on construction plans. 4800 West will receive a 2” Mill and 2” Overlay PG 64-34 UDOT Spec Superpave Mix encompassing 19,280 Square feet, Overlay areas as outlined on references plan maps will follow specified standards and generally include but are not limited to 2” Full Width Milling, Delivery and Placement of Standard Paving Reinforcement Fabric according to Manufacturers and APWA Specifications; Delivery, Placement, and Compaction of 3” Superpave Asphalt Overlay; Raise Monuments, Valves, and Sewer and Manhole Lids to Grade; Replace Existing Striping; and any other Materials and Labor necessary to complete the job based on construction plans. The tennis court parking lot encompasses 37,310 square feet as outlined on the reference maps and will follow specified standards, and generally includes but is not limited to Tree Trimming; 1.5” Edge Milling; Delivery and Placement of Standard Paving Reinforcement Fabric according to Manufacturers and APWA Specifications; Delivery, Placement and Compaction of 2” PG58-28 Asphalt Overlay; Raise Monuments, Valves, and Sewer and Manhole Lids to Grade; Replace Existing Striping; and any other Materials and Labor necessary to complete the job based on construction plans. Cindy Felt +1 801-254-3742 ext. 1397 cfelt@sjc.utah.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT