Access the Full Project by Clicking here!
Bidjugde
JOB
N9857 Dilkon Road Improvement
BID DATE
06/20/22 - 3:00
AGENCY
Navajo DOT
ESTIMATE
n/a
SCOPE
BORROW/ROADWAY RECONDITIONING: Subgrade Preparation: Roadway to be 22-ft wide at top of subbase and 20-ft wide at top of ABC (ABC to be installed at a later date, not a part of this contract). Borrow shall be obtained from on-site excavated hill (knoll). The existing roadway at the Beginning of Project (off Navajo Route N60) shall be lifted with all excess material according to plans and roadway typical sections. SUBGRADE STABILIZATION: The on-site borrow fill and the top 6” of the roadway shall be processed and compacted to 95% moisture and density, the profile shall provide 2% grade from centerline to shoulder. letsitty@nnooc.org BrianT@navajodot.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT