Eastmark Community Facilities District 1 2 Phase XXI Roadway Improvements
BID DATE
06/30/22 - 1:00 LIVE!
AGENCY
Mesa
ESTIMATE
$11,500,000
SCOPE
1. Offsite Improvements Mesquite Road Phase 1 (S907) – The Project consists of approximately 3,500 linear feet of full street width roadway improvements for E. Mesquite Street and S. Binary, commencing from East Everton Terrace. Improvements consist of curb and gutter, sidewalk, asphalt pavement, landscape, streetlights, and dry utility extensions. Approximately 3,600 linear feet of 16”, 12” and 8” water mains along with approximately 3,650 linear feet of 15”, 12” and 8” seer main will be installed. 2. Offsite Improvements Mesquite Road Phase 2 (S908) – The Project consists of approximately 3,400 linear feet of full street width roadway improvements for S. Binary and E. Rubidium Avenue, commencing from the end of improvement of Mesquite Road Phase 1 (S908) and terminating at Signal Butte Road. Improvements consist of curb and gutter, sidewalk, asphalt pavement, landscape, streetlights, and dry utility extensions. A new right turn lane is proposed along Signal Butte Road and a cul-de-sac is proposed at the end of Parc Joule. Approximately 3,900 linear feet of 16”, and 8” water mains along with approximately 700 linear feet of 8” sewer main will be installed. 3. Offsite Improvement Traffic Signal at Ray Road and Bradley Way (S909) – The Project consists of the installation of a four-way traffic signal, signing and striping at all crosswalks at the intersection of Ray Road and Bradley Way in the Eastmark master planned community. EngineeringBids@mesaaz.gov Stephanie.Gishey@MesaAZ.gov holly.crea@brookfieldpropertiesdevelopment.com
UPDATES