Access the Full Project by Clicking here!
Bidjugde
JOB
Lift Station No 1 Force Main Replacement
BID DATE
06/1/22 - 2:00
AGENCY
Fort Bend County MUD
ESTIMATE
$1,700,000
SCOPE
The work consists of providing the necessary labor, materials, equipment, and supervision to construct Lift Station including but not limited to mobilization, bonds and insurance; demolition of the existing lift station wet well pumps, piping, accessories, vents, and other appurtenances; demolition of electrical panels and conduits; demolition of the wet well structure to 5-feet below grade and filling, and replacement with a 10-foot (10') precast manhole ring and manhole top complete with 100% solids epoxy coatings; concrete repair and rehabilitation to the exist wet well structure; demolition of the control panel, diesel generator, sub-base fuel tank, bollards, crushed concrete pavement, control panel and generator concrete slab, sections of the concrete pavement driveway, and a portion of the existing wooden fence; construction of a 12-foot (12') diameter cast-in-place concrete wet well, complete with three (3) submersible pumps with all accessories, riser piping, valves, and coatings; trench safety system at all depths; fencing; site work; sodding; concrete pavement; 16-inch (16") on-site sanitary sewer piping including well pointing and dewatering as necessary; 10-inch (10") on-site force main; one (1) 125-kW diesel engine driven generator with sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank; generator concrete pad; service rack and control panel pad; automatic transfer switch; load bank testing; lift station control panel; automatic telephone dialer; ultrasonic transducer; electrical service disconnect switches, conduit, and wire; temporary bypass pumping; Storm Water Pollution Prevention Plan implementation, maintenance, and record keeping; construction staking to be performed by Quiddity Engineering, LLC (one time only) of property corners and wet well center; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station; and approximately 1,933 LF of off-site sanitary sewer force main, and all else shown on the construction drawings and detailed in the specifications for the off-site sanitary sewer to discharge to the existing system. https://www.civcastusa.com/project/627538bbcf2886809c99a27a/summary cluhrs@quiddity.com
UPDATES