Moroni Culinary Water Improvements 2022
BID DATE
05/26/22 - 12:00
AGENCY
Moroni
ESTIMATE
n/a
SCOPE
There is approximately 7,000 feet of pressurized pipeline that connects three culinary wells to a new tank and an existing tank. A new 500,000-gallon concrete water tank will be constructed and connected to the existing water system. A junction box will be installed to divert overflow from the tank to the irrigation storage pond. The existing pump line will be retrofitted to pump water to this junction box, and the new pump line will also be capable of connecting to the junction box. 3,800 feet of gravity flow pipe will convey water from the junction box to the irrigation storage pond. The new well (Well #4) will be equipped, and a new well house constructed at the well site.