Access the Full Project by Clicking here!
Bidjugde
JOB
Woodside Avenue Flood Control Improvements
BID DATE
12/4/14 - 2:00
AGENCY
San Diego County
ESTIMATE
$14,600,000
SCOPE
consists in general of replacing approximately 2,400 linear feet of existing storm drain facilities with a new 30-foot wide by 5.5-foot high box culvert, providing downstream erosion protection and on-site environmental mitigation, lowering of three existing water main lines, realignment of two sewer main lines, and undergrounding of overhead utilities. The project will also include, but not limited to Resident Engineer’s Office, Traffic Control, Trench Safety and Shoring, Clear and Grubbing, Excavation, Backfill, Dewatering System, Storm Water Pollution Prevention Plans, Erosion Control, Best Management Practices, Cellular Block, Asphalt Concrete, Structural Concrete Work, Catch Basins, Curb Inlets, Minor Concrete Work, Reinforced Concrete Pipe, Jacking of a Dual Reinforced Concrete Box, PVC Sewer Pipe, Sewage By-Pass System, Sewer Manholes, Water and Sewer Laterals, CCTV Inspection of Watermains, CML&C Steel Water Pipe, PVC Water Pipe, Access Manholes, Cathodic Protection, Connection Specials with Insulating Flange Kits, Blow-off Assemblies, Air/Vac Release Valves, Irrigation and Landscaping, Rock Slope Protection, Chain Link Gates and Fencing, Traffic Striping and Pavement Markings, and Traffic Signal Modification. Additive Alternate items are included for joint trenching of SDG&E, AT&T, and COX utilities. KRISTEN HILL, Procurement Contracting Officer Email: Kristen. Hill@sdco untv.ca.oov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT