Geysers Delta Connection Improvements
BID DATE
06/1/22 - 2:00
AGENCY
Santa Rosa
ESTIMATE
$1,456,610
SCOPE
Upsize the connection between Delta Pond and the existing 33" Geysers Line which ends just outside the toe of the pond. The length that needs to be upsized is approximately 130 feet from 12" to approximately 24". Upsizing this connection will allow recycled water to be delivered to Delta Pond using the Geysers pipeline in the event that the aged reclamation piping network is compromised and will provide redundancy. Andrew Wilt (707) 543-3878 AWilt@srcity.org