Access the Full Project by Clicking here!
Bidjugde
JOB
North Pump Station Improvements
BID DATE
05/17/22 - 2:00
AGENCY
Taylor
ESTIMATE
n/a
SCOPE
The project work includes the following: Installation of two new high service pumps, associated suction and discharge piping, control valves and fittings; Connecting new motors and instrumentation to the existing motor control center and instrumentation cabinet, respectively; Installation of an emergency stand-by generator and automatic transfer switch. The City has executed a procurement contract for the emergency stand-by generator and automatic transfer switch. The selected Contractor will be assigned the procurement contract, taking responsibility for receiving the equipment, equipment installation, and startup. An allowance in the bid form will cover all remaining costs related to this equipment, including shipping. https://www.civcastusa.com/project/626825fb08b59f9c3467668a/summary lisa.singer@hdrinc.com
PREBID
5/9/2022 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT