Access the Full Project by Clicking here!
Bidjugde
JOB
Annual Citywide Street Resurfacing Ada Improvement Program Fy 2022
BID DATE
05/19/22 - 2:00
AGENCY
Pasadena
ESTIMATE
$29,000,000
SCOPE
The work includes: Construction including asphalt rubber hot mix; localized street reconstruction including street resurfacing, removal of existing asphalt concrete pavement; saw-cutting, excavation, removal and disposal of the AC roadway section; cold milling of existing asphalt concrete; crack seal; the removal and reconstruction of damaged concrete improvements including curb and gutter, sidewalk, driveway aprons, cross gutters, local depressions and culverts; adjustment of existing utility manholes and valve frame and covers; replacement of traffic signal loop detectors, the installation of permanent traffic striping and raised pavement markers; clean-up of the project area; and miscellaneous appurtenant work. James Tong, 626-744-3711,jtong@cityofpasadena.net https://pbsystem.planetbids.com/portal/14770/bo/bo-detail/93329#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT