Access the Full Project by Clicking here!
Bidjugde
JOB
Sacramento Marina & Miller Park Boat Ramp Dredging
BID DATE
09/10/14 - 2:00
AGENCY
Sacramento
ESTIMATE
$270,000
SCOPE
Sacramento Marina Entrance Channel Dredging: This project consists of thedredging of a maximum of 1,700 cubic yards of silt from the Sacramento Marinaentrance channel to a depth of -2ft (NAVD 88). The dredging must be performedby clamshell. All work shall be completed to the satisfaction of the MarinaManager. This wet material shall be hauled to the “City overflow lot” for dewatering.Existing vegetation may be trimmed, but not removed, toaccommodate equipment.Miller Park Boat Ramp Dredging: This project consists of the dredging of amaximum of 500 cubic yards of material from the Miller Park boat ramp. Thedredging may be either by excavation or clamshell, whichever is more costeffective. The silt shall be hauled to the “City overflow lot” for dewatering. Allwork to be completed to the satisfaction of the Old Sacramento Manager/MarinaManager. Jose Ledesma - 916-808-8195 JLedesma@cityofsacramento.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT