1 3 MG Fleming Zone 8 Reservoir Zone 8 9 Pump Station
BID DATE
07/13/22 - 2:00
AGENCY
Irvine Ranch WD
ESTIMATE
$13,000,000
SCOPE
The project includes, but is not limited to, demolishing of existing storage building, administration building, pump station, tank, and generator, constructing interim site grading for tank pad and access road widening, tank subgrade preparation, tank floor, wall drains, and tank leak detection system, 1.3 MG pre-stressed concrete tank including tank appurtenances, pump station building with pumps, electrical, operations, and bathroom, Reservoir Management System (RMS) building with chemical storage tanks and pump system, storage building, storm drain, stormwater biofiltration system and storm weir structure, subdrain piping, site improvements and landscaping. Harry Cho 949-453-5675 cho@irwd.com https://pbsystem.planetbids.com/portal/39499/bo/bo-detail/93922